Miron Construction Co., Inc. provides innovative preconstruction and construction services to markets across the United States. When they were named as the construction manager for a 18-story hotel and casino development in Beloit, Wisconsin, they knew the concrete pumping operation had to perform flawlessly from the first pour to the last.
The challenge was straightforward: coordinate multiple pours across 18 floors using a Putzmeister 2110 trailer pump paired with a 38Z placing boom. That setup demands pipeline components engineered to handle sustained pressure, repeated cycles, and the unforgiving tolerances of high-rise construction. With the schedule tight, there’s no room for downtime, no second chances, and no margin for equipment failure.
Miron reached out to Con Forms to design the concrete placement system using our CPMA-certified components. Con Forms delivered a system built for the job. Two diversion valves managed efficient transitions between placing lines. A washout station simplified cleanup between pours. The backbone of the system consisted of heat-treated, 5″ diameter, quarter-inch wall pipe, secured with forged two-bolt couplings, floor brackets, and support components proven to perform under pressure.
What made the difference wasn’t just the components. It was the engineering behind them. Every piece in the pipeline was selected for the specific conditions of this project—the height, the pump capacity, the boom configuration, and the concrete volumes Miron needed to move on schedule. Con Forms’ engineering team works with all customers to design a layout that fits the jobsite reality, not a generic one-size-fits-all approach.
Con Forms’ engineers consulted on specs, pressure ratings, and bracket placement to ensure the system performed safely and reliably. That level of technical support isn’t incidental. For contractors running high-rise projects, it’s the difference between predictable operations and costly guesswork.
Throughout the project, the pipeline system lived up to its design. The diversion valves operated smoothly across multiple pours. The couplings and brackets secured the line, and the washout station kept cleanup efficient. By the end, Miron placed the concrete safely and on schedule, with equipment that performed as specified.