CON FORMS SUCCESS STORY: NYC EAST RIVER TUNNEL REHAB PROJECT

PROJECT NAME: NYC East River Tunnel Rehab Project

PUMPING COMPANY: Our Rental Pumps (Farmingdale, NY)

PUMP: Putzmeister BSA 14,000 HP D4 stationary concrete pump 

CONTRACTOR: Skanska 

CON FORMS PRODUCTS: over 3,000ft of 3/8″ wall, 5″ laydown pipe & Super High-Pressure/Standard 2-bolt couplings.

OVERVIEW:

Skanska, a leading global construction and development firm, and joint venture partner, E-J Electric Installation Co., are leading this project for AMTRAK in New York City.

The project includes the rehabilitation of Line 1 and Line 2 of the East River Tunnels that were damaged by Superstorm Sandy, with the work on each consisting of the demolition of all tunnel components to the existing concrete tunnel liner, the repair of structural deficiencies of the tunnel concrete liner, and reconstruction of the bench walls and duct banks.

These images are of the duct bank repairs.

Thanks to the Our Rental Pumps team for partnering with Con Forms on this vital project. We are happy to play a small, but important, role in maintaining our transit infrastructure. The forthcoming upgrades will greatly improve safety, reliability, and modernize the 2.5-mile-long tunnels connecting New York Penn Station and Sunnyside Yard.

English